Well, there hasn't been done this past week due to the rain. That has pushed things back a week.
Everything that was supposed to happen this week will now happen next week and some of those things include paver installation from the zig-zag line about mid-way on the lot to the Main Street curb.
The precast caps along the art pedestals, seat walls and curbing will begin to be installed starting on Tuesday and installation of irrigation systems should begin soon. In the photo below, you should be able to see the color concrete band in the surrounding the center that was installed last week.